Hines VA Medical Center – Hines, IL

Edward Hines

Air Conditioning Installation

Midwest MEP completed a design / build project at the Main Engineering Building to Air Condition areas that were previously served with old window air conditioners. To preserve the visual integrity of the 90 year old structure, a Variable Refrigerant (VFR) system featuring (22) indoor air handlers and only (2) outdoor condensers was the answer. All indoor units feature LED remote thermostats.

 

Chiller Replacement Bldgs. 217, 220

Midwest MEP has provided Chiller Replacements requiring multiple trades and full onsite coordination and supervision for 400 Tons of new refrigeration. Midwest MEP performed these project on time and on budget.

 

Temperature Control Retrofit

Midwest MEP was awarded the contract to replace Temperature Controls on a Critical Care Post Operative / Infusion Floor. The project was of critical importance because of the required positive and negative pressurization required in specific rooms and the small timeframe allowed to move patients off the floor so that work could be completed. The final phase involved re-commissioning the entire floor to bring all airflow values back to original design.